Ok so I purchased my CR4XL and QSBs. I am looking at the board and I would like some clarifications on the install. I am not seeing any detailed pictures of the contact points for these QSBs. I do not know anything about an AUD Clamp. What it is how to install it or if I need it. Can someone please help me?
There is a C3B2 spot and right next to it a R4B24 spot. They are really tiny. Which one does the finger of the QSB solder to? Does it matter if they bridge?
I would also like the location points for the other two QSBs. Do I need to tape the tip of the JTag ALT V 2 QSB so it does not make contact or do I have to make contact? I see conflicting information. The only videos I am seeing online are using a different QSB that has some kind of ribbon connection.
I also have some kind of covering over the DIP switches. Do I just take that off with a razor blade to adjust the DIP settings?
I am interested in doing the rater and fine tuning the install as well. Information on that would be helpful.
There is a C3B2 spot and right next to it a R4B24 spot. They are really tiny. Which one does the finger of the QSB solder to? Does it matter if they bridge?
I would also like the location points for the other two QSBs. Do I need to tape the tip of the JTag ALT V 2 QSB so it does not make contact or do I have to make contact? I see conflicting information. The only videos I am seeing online are using a different QSB that has some kind of ribbon connection.
I also have some kind of covering over the DIP switches. Do I just take that off with a razor blade to adjust the DIP settings?
I am interested in doing the rater and fine tuning the install as well. Information on that would be helpful.
Last edited: