Doing Demon/Rjtag

StonedBanana

Full Member
Jan 9, 2014
33
0
Los Angeles
Is there any tutorial out there that can tell me what to do as I haven't seen any out there, do I install the demon first and then rjtag or what? I already have my rjtag install on a bb jasper, can I just write the stock nand to the demon or what?
 

BL4K3Y

VIP Member
Jul 7, 2010
13,721
118
Colne, Lancashire (UK)
I always install the DemoN first, get a good NAND read and then install the R-JTAG kit after checking that the stock NAND image boots from the DemoN's NAND.

Both products have their own guides - read them, understand them and when (and only when) you feel you have done enough reading, install the hardware.
 
Last edited:

StonedBanana

Full Member
Jan 9, 2014
33
0
Los Angeles
To be honest Im very comfortable with doing the rjtag install, but I don't know how to do the install after I install the demon if there was pictures of what to do I would appreciate it
 

BL4K3Y

VIP Member
Jul 7, 2010
13,721
118
Colne, Lancashire (UK)
To be honest Im very comfortable with doing the rjtag install, but I don't know how to do the install after I install the demon if there was pictures of what to do I would appreciate it
There isn't much difference between a standard R-JTAG install and an R-JTAG install with a DemoN installed.

Install the kit as per the guide and fit the smaller ribbon cable between the R-JTAG PCB and the DemoN (this is enable/disable for R-JTAG).

If you decide to use RATER, you should leave the KIOSK (X7) wire off your DemoN install for the time being because R-JTAG requires KIOSK to power the console on during RATER testing.

Please take my advice and read both guides and understand the process before attempting to do anything.